Warm congratulations on the successful completion of the 168-hour full-load trial operation of our company's Shanxi Yiguang Power Plant project

浏览 Source: Unknown Release time: 2019-06-13 16:13 Times

年06月13日08时18分,山西奕光电厂(2×350MW)低热值煤发电工程3号机组,顺利通过连续168小时满负荷试运行,机组负荷满足电网调度要求,各项指标均达到国内同类机组的先进水平,标志着奕光电厂两台机组完成全部建设、调试任务,正式投入商业运营。 At 08:18 on June 13, 2019 , Shanxi Yiguang Power Plant (2 × 350MW) low-calorie coal power generation project No. 3 unit successfully passed the 168-hour full-load trial operation, and the unit load met the grid dispatching requirements. Reaching the advanced level of similar units in China indicates that the two units of Yiguang Power Plant have completed all construction and commissioning tasks and are officially put into commercial operation. During the 168-hour full-load trial operation of the coal storage silo project and indirect cooling tower project of Shanxi Yiguang Power Plant undertaken by our company, the main equipment and its auxiliary equipment operated safely and stably.

The construction of coal storage silos and ancillary buildings in Shanxi Yiguang Power Plant (2 × 350MW) low-calorific value coal power generation and heating projects. The construction scope includes three 30,000-ton coal storage silos and ancillary buildings. The project started in 2014 and was completed in 2016.

Shanxi Yiguang Power Plant (2 × 350MW) low-calorie coal power generation and heating engineering room cooling tower and ancillary works, the main construction content is a natural ventilation hyperbola indirect air cooling tower, the height of the tower is 180m, the diameter is 164m, the exit diameter is 101.5m, the throat The diameter is 99m and the height of the air inlet is 27.5m. The project started in 2015 and was completed in 2016.

100 米以上的高空,零下二十度以下的气温,面对复杂的气候条件,我公司项目部一路披荆斩棘、砥砺前行,克服重重困难。 The location of the Shanxi Yiguang Power Plant project is harsh, with high winds and cold weather, high altitudes above 100 meters, and temperatures below -20 degrees Celsius. In the face of complex climatic conditions, our project department has been struggling to overcome difficulties . The project department promotes the enterprise spirit of "unity, hard work, dedication, and dedication" and the service-oriented corporate purpose. It is not afraid of danger, strives hard, achieves fast entry, orderly construction, and faithful performance, and has won the general contractor, supervision, and owner Highly praised.  项目主要成员.jpg

Key personnel of the project department

山西奕光电厂间冷塔.jpg

Cold tower

QQ图片20190613153331.jpg

Coal storage silo